The Digger is making a path and then gravel is added
Next we are going to add plants along the path and encourage the grapevines to grow over the Archways and have solar lights hanging over the Archways
We have built a new Archway entrance for our large Family Tipis and Yurt
We have dug out a new zen pond for our Koi Carp fish, ducks and chickens. Next is to add pond plants in and around the pond and a bench on the terrace up , looking down so we can all enjoy feeding them!
View of swimming pool from the sun shaded terrace behind the pool, at this stage its part tiled
Next, the inside of the pool will be painted blue. Then finished tiled and walls painted. The steps lead down the pool are child friendly. It is 6 metres by 6 metres and 1 .5 metres deep. It will be ready May 1st
Here Calvin and the guys taking a break from being hard at work building a pathway up to the shaded area of sunloungers and hammocks behind the swimming pool.
Now the path is laid , plants added and just the roof to go on the top of the shaded area at the top.. Its a big countdown , just a few weeks left to go and we will be ready!